Austin Bouldering

Austin Bouldering, an expansive world-class facility offering climbing walls, yoga studios and fitness areas with weights and co-working and social spaces needed a complete rooftop HVAC replacement to enable them to continue to offer occupants the optimal temperature and air quality for exercise.

 

SOLUTIONS

 

• Climate Solutions evaluated the existing rooftop AC unit’s performance, age, efficiency, and looked for ongoing issues.

• Assessed the cooling requirements of the space to determine the appropriate size, capacity, and specifications of the new rooftop AC unit.

• Established a budget for the replacement, taking into account the cost of the new AC unit, installation, removal of the old unit, crane services, and any necessary upgrades or modification requirements discovered during install.

• Planned the replacement timeline, factoring in weather conditions, building occupancy, facility hours and stakeholder needs.

• Ensured installation crew and crane service availability and verified other required equipment procurement.

• Confirmed local regulations and compliance for removal and disposal of the old rooftop AC unit.

• Disconnected and removed the existing rooftop AC unit, ensuring safe handling of refrigerant and other hazardous materials.

• Disposed of the old unit in accordance with local environmental regulations.

• Positioned and installed the new rooftop AC unit securely, aligning it with the existing roof structure and equipment supports.

• Connected refrigerant lines, electrical wiring, and all necessary ductwork according to manufacturer guidelines and industry standards.

• Conducted thorough testing of the new AC system to ensure proper functionality, refrigerant charge, and performance.

• Calibrated the system for optimal cooling and energy efficiency.

• Scheduled regular maintenance checks and service for the new rooftop AC unit to ensure its longevity and efficiency.

• Educated the building owner or facility manager on routine maintenance tasks and schedules.